Gaznet Industrial is exhibiting at BioPower 2026, the trade fair for biogas, biomethane, biofuels and biomass, from 29 September to 1 October 2026 at Ptak Warsaw Expo near Warsaw. You will find us in Hall C, stand B36.
What we will show
Our focus at the fair is the part of a biomethane project that starts after the upgrading unit: getting the gas from the plant to the point of use where there is no grid connection — the virtual pipeline.
- Lighter containers that carry more gas. Our MEGC configurations use composite Type 4 cylinders and are designed to make effective use of the transport weight and space available. See how biomethane capacity is calculated for a MEGC and when a 20 ft or a 40 ft container makes sense.
- The complete transport setup. Container and trailer selection, loading and unloading interfaces, and a transport solution matched to your route, gas volume and filling infrastructure. Browse our biomethane transport containers and the tube-trailer solution.
Bring your numbers
If you are planning a biomethane plant or a delivery route, bring your expected annual gas volume and delivery distance to the stand. We will work out with you how many containers and trips your site needs.
Practical information
- Dates: 29 September – 1 October 2026, daily 10:00–17:00
- Venue: Ptak Warsaw Expo, Hall C — Al. Katowicka 62, 05-830 Nadarzyn, Poland
- Stand: B36
- Visitor registration: free, on the BioPower website
To arrange a meeting at the stand in advance, contact us.
Related reading
News
Membrane separation — compact, flexible, and growing fast
How membrane separation upgrades raw biogas to biomethane — the science, the operational economics, and where it fits relative to PSA and water scrubbing.
News
CNGCylinders.eu for CNG and hydrogen cylinders
CNGCylinders.eu is a Gaznet platform connecting CNG and hydrogen professionals to certified cylinders, MEGC systems, and technical resources.
News
CNG vehicle conversion: cylinders and installation
How CNG vehicle conversion works, from choosing the right cylinder type to the installation sequence and when conversion makes sense.
Talk to our engineers
From CNG and biomethane to hydrogen — we'll scope your project and reply within one working day.